Serviceportal Industrie

Power Plant Construction

Structural Elements 100

NEW

Assembly Set MS 5P


Group

A640


view as PDF file

Application

Element for connecting Beam Bracket TKO, Angled Beam Bracket SKO, End Support WBD or Pivot Joint GE F to a beam section.

Scope of delivery

Type
Beam Clip
[Quantity]
Support plate
[Quantity]
HR trimming *
[Quantity]
M12 S 4 x M12 4 x M12 4 x M12 x 80
M16 S 4 x M16 4 x M16 4 x M16 x 100
M12 S2 2 x M12 2 x M12 2 x M12 x 80


* HR trimming according EN 14399-3 consisting of:
Hexagon bolt M12 or M16, 2 washers, 1 hexagon nut

Installation

1.
Position Beam Clip with the split end on beam section.
2.
Install support plate and HR trimming and tighten accordingly.


The support plate secures a rectangular assembly of the bolt and prevents its shifting or bending stress. In conjunction with the HR trimming a continuous and predictable preload force is guaranteed.

Technical Data

Type
Size range
[mm]
Tightening torque MA
[Nm] /
Weiterdrehwinkel
Fy perm.
per Beam Clip
[kN]
Shear force load capacity Fz
per set = 4 Beam Clips
[kN]
M12 S 1 - 30 60 / 90° 26,3 12,0 *
M16 S 4 - 40 140 / 90° 32,0 13,6 *


* The specified data relate to the worst case with flange thicknesses 30 mnm (M12) or 40 mm (M16) as well as a coefficient of adhesion µHaft = 0,20.
A possibly operating tensile force Fy isn´t included.

Material:
Steel, HCP
Type W
[kg]
Qty.
[set]
Part-
No.
M12 S 1.2 10 115843
M16 S 2.2 10 115844
M12 S2 0.6 10 115845